How do you size an air compressor? Establish the flow and pressure your operation needs over time, record air quality and site conditions, then ask suppliers to demonstrate how their proposed equipment will meet that profile. A demand calculation starts the specification; it cannot by itself select motor power, compressor controls or receiver volume.
This guide uses five practical steps to prepare that brief. It does not prescribe an industry-wide simultaneous-use factor, a standard leakage allowance or a universal temperature correction. Use the compressor sizing calculator to keep your demand arithmetic explicit, and the worksheet below to record what still needs verification. Pressures are bar gauge unless stated otherwise.
Optional: Free 2-page printable PDF compressor demand & sizing worksheet
Working through a sizing job now? Get the worksheet.
Free two-page PDF. Record demand, overlapping uses, short peaks, pressure and site conditions. Separate measured facts from planning allowances and take the outstanding equipment checks to a supplier. Email only, and the download is on the next screen.
We email you the PDF and nothing else unless you ask. Form not loading? Email byron@compressedairsolutions.com.au.
1. Why the demand profile matters
Buying against the largest catalogue number can leave a machine poorly matched to normal operation. Buying against an average without checking bursts can leave the plant short of air. The useful brief includes normal, minimum and peak demand, how long each lasts, and the pressure needed at the point of use.
For an existing installation, collect representative flow, pressure and package-power records across production, breaks and start-up. Note the measurement location and operating conditions. The Australian Government compressed air guide explains how monitoring supports demand profiling, leak reduction and control improvements. Resolve avoidable demand before pricing a larger supply.
2. Step 1: Record each use and its flow basis
Start with the actual tool or process manufacturer data, or a suitable measurement. Record equipment identity, operating pressure, flow units, reference conditions and whether the stated consumption is continuous, average or per cycle. A cylinder volume at line pressure is not already a free-air flow figure. Ask the equipment supplier to resolve an unclear basis before combining it with other figures.
| Record | What belongs in the brief |
|---|---|
| Equipment and location | Actual model, quantity and where it is used |
| Consumption | Flow or air per cycle, pressure and source of the figure |
| Operating pattern | Cycle duration, frequency, running hours and overlapping uses |
| System measurements | Meter location, flow basis, sampling period and production state |
| Uncertainty | Missing data, assumptions and the person responsible for confirming them |
Keep an audit trail: a spreadsheet row should lead back to the relevant data sheet or measurement. A generic tool table can help identify missing information, but it does not verify the consumption of your equipment.
3. Step 2: Separate normal demand from short peaks
For a tool list, establish which uses actually overlap. Do not assume that every listed tool runs continuously, or that all possible simultaneous operation can be dismissed. Record short events separately with their duration, repetition and minimum acceptable pressure. If you start from measured whole-system flow, a second coincidence reduction may count the same effect twice.
The CAGI system design handbook, Chapter 4, distinguishes average consumption from demand events and considers storage with compressor controls. Use a supported operating schedule or measurement for your factor; the name of the industry does not establish it.
4. Step 3: State leakage and future demand explicitly
List known leakage and the repairs planned before the new system is commissioned. When measured system demand already includes leaks, do not add the same leakage again. For future demand, name the planned equipment or production change and when it is expected. A percentage may be useful for an early scenario, but label it as an assumption and avoid carrying overlapping allowances through several worksheets.
The calculator uses planning flow = audited demand × simultaneous-demand factor × (1 + leakage allowance) × (1 + growth allowance). Here each percentage is an addition to the preceding result. It is not a measured leak fraction of total compressor output, and the two allowances compound. Keep zero as an option when no additional allowance is justified.
5. Worked example: a planning demand of 66 L/s
These numbers are illustrative, not a survey of an actual plant or an equipment recommendation. Suppose the tool audit totals 100 L/s on a common reference basis. An observed schedule supports a 0.50 overlap factor. The planner records a 10 per cent additional leakage assumption and 20 per cent future demand assumption.
| Calculation | Result |
|---|---|
| 100 L/s × 0.50 | 50 L/s concurrent demand |
| 50 × 1.10 | 55 L/s including the stated leakage addition |
| 55 × 1.20 | 66 L/s planning demand |
| 66 × 0.06 | 3.96 m³/min on the same reference basis |
The brief also records 7 bar gauge at the required operating point, a 35°C compressor inlet design condition, 300 m elevation, and a separate 90 L/s demand event lasting 20 seconds. Those conditions do not turn 66 L/s into an automatic nameplate rating. The supplier must explain how the proposed capacity, storage and controls cover the full profile, including recovery before the next event.
6. Step 4: Compare delivered flow at the required pressure
CFM, L/s and m³/min are volume-flow units. Free Air Delivery (FAD) expresses delivered air as an equivalent flow at stated inlet or reference conditions. Changing units does not change that basis. A catalogue displacement figure cannot be treated as verified delivered flow, and a motor kW figure is not an airflow rating.
| Conversion | Factor |
|---|---|
| CFM to L/s | × 0.4719474432 |
| L/s to CFM | ÷ 0.4719474432 |
| L/s to m³/min | × 0.06 |
For example, 100 L/s is approximately 211.9 CFM. Keep the same reference basis on both sides of that conversion. Compare the proposed package at the required discharge pressure, taking account of the pressure needed at the end use and the assessed losses through treatment and distribution. Delivered flow falls as rated pressure rises, and by how much depends on the model, so read it from the supplier's data at your pressure, not from the catalogue's headline figure.
ISO 1217 describes displacement-compressor acceptance testing; it does not approve this planning guide or prescribe the allowances above. CAGI performance data can support comparison at stated operating points. Ask for the exact offered model, delivered flow, test/reference conditions, operating pressure and total package power, including the limits of any performance verification.
7. Step 5: Have the offered equipment checked for the site
Record the expected compressor inlet temperature range, elevation or local inlet pressure, humidity, cooling conditions, ventilation and installation constraints. Ask the supplier to state available flow and package limits under those conditions. Atlas Copco explains that altitude assessment depends on the machine, drive and operating conditions. A simple air-density ratio is not a verified correction for every compressor design.
Confirm the air-quality requirement at each critical use with the process owner and competent adviser. Specify how the supplier will verify it, including the measurement point and treatment performance across the expected operating range. Choosing an oil-free compressor alone does not settle every air-quality requirement. The US Department of Energy air-quality guidance discusses selecting treatment to suit the application.
Need Help Sizing Your Compressed Air System?
Tell us about your tools, processes and facility, along with any demand figures you have. Let us know where you're up to with sizing and what you need help with.
8. Receiver storage and controls need a joint check
Ask the designer to show how storage covers the identified demand events, how far pressure may fall, where storage is located, and how it refills. Also ask how receiver volume interacts with the compressor control method and permitted cycling. A single litres-per-L/s multiplier cannot establish the right vessel for every installation.
The US Department of Energy storage guidance relates storage to demand patterns, air requirements and controls, including storage near intermittent uses. A storage calculation is also separate from pressure-vessel design, registration and inspection duties. Have those checked for the installation and jurisdiction; the receiver guide provides background.
9. Compare control options and outage arrangements
Request a comparison of the proposed control options against your actual load profile, including minimum flow, unloaded or standby power, permitted starts, transitions between machines and maintenance arrangements. Do not select VSD solely from a demand-ratio rule or assume a payback period. The US Department of Energy control guidance explains why supply, storage and changing demand need to be considered together.
State which production can stop and for how long. Ask what happens when a compressor, dryer, controller or electrical supply is unavailable, and whether the remaining system can maintain the required flow and air quality. N+1 means enough duty capacity remains when one required unit is unavailable; it need not mean one working compressor and one identical spare. Agree commissioning tests and maintenance rotation with the equipment supplier rather than imposing a universal weekly exercise rule.
10. Compare operating cost using package power and time
For each operating state, multiply measured or supported package input kW by hours and the applicable energy tariff, then add the states. For illustration only, a constant 52 kW input for 4,000 hours at the A$0.27/kWh Australian C&I benchmark gives A$56,160. That is energy arithmetic, not the price of operating every 45 kW compressor, a current Australian tariff quote or a complete ownership-cost estimate.
Include treatment energy, unloaded operation, maintenance, installation, capacity charges where applicable, and any planned changes in use. Compare offers over the same scenario. The US Department of Energy cost method distinguishes operating levels rather than applying one motor rating to every hour. Ask each supplier to show the assumptions behind a savings or payback claim.
11. Before accepting a sizing proposal
- Can each demand figure be traced to actual equipment or a measurement?
- Are overlap, leakage and future demand counted once, with assumptions marked?
- Are short peaks, recovery time and minimum point-of-use pressure covered?
- Does the offer state the exact model, delivered flow basis, pressure and site limits?
- Are storage, controls, air treatment and failure arrangements explained?
- Do the cost comparison and commissioning checks use the same operating scenario?
Interactive CAS calculators to cross-check a supplier offer
| Specification Check | What It Verifies | Open Calculator |
|---|---|---|
| Tool & plant demand | Concurrent flow, leakage allowance, and future growth in L/s and CFM | Compressor Sizing Calculator |
| Peak receiver buffer | Short-burst storage volume (Boyle's Law differential pressure check) | Receiver Sizing Tool |
| Ring-main bore & drop | Header pressure drop against the 0.1 to 0.3 bar distribution target | Pipe Pressure Drop Tool |
| 10-year electricity TCO | Fixed-speed vs VSD lifecycle electricity and capex at $0.27/kWh | 10-Year TCO Calculator |
For sector leakage benchmarks, see the 2026 Australian compressed air leak cost report.
12. Frequently asked questions
How do I calculate how much airflow (L/s) my air compressor needs?
What is the difference between cfm and FAD?
What size air compressor do I need for a workshop?
How do I convert L/s to cfm for compressor sizing?
Does ambient temperature really affect compressor sizing?
How big should my air receiver tank be?
Should I oversize my compressor for future growth?
Can one formula size any air compressor?
13. Get Expert Sizing Guidance for Your Operation
Share your application, location and sizing questions. Include any calculations or supplier specifications you already have.
14. Related reading
- Air Compressors Hub: selecting the right compressor type
- Rotary Screw Air Compressors: continuous-duty detail
- Piston Air Compressors: workshop and intermittent duty
- Oil-Free Air Compressors: food, pharma, electronics
- Portable Air Compressors Australia: background for site and mobile applications
- Industrial Air Compressors Australia: centralised plant
- Air Receiver Tanks Australia: storage sizing
- Air Compressor Installation Australia: installation planning
- Compressed Air for Manufacturing: system-level sizing including VSD trim, base load split, and demand audit methodology
- Compressed Air Dryers and Air Quality: drying and filtration
- Pharmaceutical Compressed Air: sizing for GMP validation and redundancy.
- Packaging and Bottling Compressed Air: 24/7 high-volume sizing with blow moulding demands.
- System Design Guide: full system architecture from demand profiling to distribution layout
- Air Compressor Running Costs: AUD running-cost table by size and shift pattern, and the four levers that cut the bill
15. Tell us what you need
Describe your application and location. The automatic receipt confirms your enquiry has arrived, not that anyone has reviewed it. If a suitable supplier is available, we can discuss an introduction, but we'll only share your details with your written permission. We can't promise a supplier match. Enquiries are free, with no obligation, and we don't sell equipment.
What happens when you send an enquiry (Zero-Spam Guarantee)
- 1-to-1 match: Never sold to multi-bid lead brokers or added to marketing lists.
- Vetted Australian panel: Chartered RPEQ pressure-vessel engineers (AS 1210 / AS 4343), AS/NZS 3788 inspectors, and multi-brand specialists across NSW, QLD, VIC, SA & WA.
- You stay in control: Request a direct CC introduction or ask to review the proposed firm’s name first; we may receive a referral fee if you proceed (how we are paid).
Form not loading? Email us directly at byron@compressedairsolutions.com.au.